Sunday 6 September 2009

Flash Flood

1. 800 feets field road to our labor quarters at low level / peat area.
2. Normally, if there is more than 3 hours rain, 70% of the road will be flooding within 3 to 4 hours depends on the water level.
3. I have constructed 800 mtrs wood titi to make sure the operators will not absent on the follwing days.
4. We have alternative road that is 1.5km compare to this road. Those who have motocycle, they will use that road.
5. However, most of the workers are walking and they are prefer to use this road.

I have constructed the longest titi ever in my life!
Posted by Picasa

No comments:

Post a Comment