External corrosion on tube
Cause : Soot accumulation on tube nest.
Preventive measures :
1. Proper weekly cleaning on tube nest.
2. Operate soot blower at every 4 hours operation.
Tube blockage due to scaling
Cause : Poor water treatment
i.e
TOO MANY INCIDENCES OF TURBID WATER.
BYPASSING OF SOFTENER, DEAERATOR AND SAND FILTER.
PREVENTIVE MEASURES :
PROPER DAILY MONITORING OF BOILER WATER ANALYSIS AND CONTROL DOSAGE OF CHEMICALS.
CHECK DOSING PUMPS.
CHECK AND CONTROL SOFTENER, DEAERATOR AND SAND FILTER. SERVICE IT ACCORDINGLY.
OBSERVE BOILER BLOWDOWN PRACTICES
No comments:
Post a Comment